The Selby installation team replaced damaged areas within a London hotel kitchen. Floor primer and rapid set latex were supplied and installed to all damaged areas ready for the installation of Altro walkway in the colour cloud, using the manufacturers recommended adhesive and method of fitting. To finish off the installation all joins were hot welded in a matching colour, resulting in a professional finish that the client was thrilled with.