The Selby Contract Flooring installation team uplifted and disposed of/recycled the existing carpet and underlay to prep the flooring to install the new Durafit 650 double stick underlay. Ege Highline Loop WT was fitted along the staircase and landings, and the installation method was Durafit, in line with commercial regulations. Our dedicated team worked out of hours/weekend to get the job done. The client was thrilled!