The Selby Contract Flooring installation team uplifted and disposed of one layer of the existing vinyl located at The Sweatbox, London. The concrete subfloor was then primed and prepared with one coat of smoothing compound up to 3mm thick. Sheet vinyl was supplied by the client to be installed using the manufacturers recommended adhesive and method of fitting. New single channel commercial grade aluminum nosings were installed to finish off the exciting project!